Project Overview
Custom Ship Loader Control Room for South 32
This project involved the design, construction, and supply of a new Ship Loader Control Room for South 32 on the Groote Eylandt Wharf, replacing the facility damaged during Cyclone Megan in 2024. This highly specialized building is integral to port operations, housing an operator’s console equipped with advanced control panels, communication racks, radios, and aerial systems essential for managing ship-loading activities.
Key design features include:
- Enhanced Durability: Engineered to withstand extreme environmental conditions, including high wind and salt exposure, ensuring long-term resilience in the harsh coastal setting.
- Thermal and Acoustic Insulation: Double-glazed windows and a cool room-grade door optimize insulation, reducing energy consumption and maintaining a comfortable environment for operators.
- Functional Efficiency: Incorporation of a kitchenette and ergonomic layouts to support operational needs and enhance staff productivity.
- Quality Control: Precision engineering and rigorous quality assurance measures were implemented, ensuring compliance with industry standards and operational reliability.
Project Gallery





